Substation EPC Solutions in Saudi Arabia
Engineering, procurement and construction capabilities for substations across Saudi power infrastructure — combining Masar Alrowad's local project coordination with KE Electric's verified international substation experience.
Substations are critical nodes in the power network — connecting generation, transmission and distribution while ensuring safe, reliable electricity delivery. Masar Alrowad coordinates substation projects in Saudi Arabia by combining local market knowledge, stakeholder engagement and regulatory support with the verified engineering and equipment capabilities of our strategic technical partner, KE Electric.
KE Electric's documented substation experience includes 220kV substations for hydropower plants, 35kV pre-fabricated step-up substations for wind power projects, and 11kV-35kV pre-fabricated substations for water infrastructure — delivered across international markets to EPC contractors including PowerChina.

What the substation EPC offering includes
Engineering
Substation electrical design, single-line diagrams, equipment specification and protection coordination.
Procurement
Supply of switchgear, transformers, pre-fabricated substations, ring main units and auxiliary systems.
Construction
Site preparation, equipment installation, cabling, and integration of substation automation systems.
Substation Automation
SCADA systems, relay protection, DC power supply and remote monitoring and control.
Testing & Commissioning
Pre-commissioning tests, insulation and withstand voltage tests, and system integration verification.
Local Coordination
Masar Alrowad provides on-the-ground coordination, regulatory support and local-content development.
Selected substation projects delivered by KE Electric
A sample of KE Electric's documented substation experience across international markets, delivered to EPC contractors including PowerChina and China-CEEC.
Cote d'Ivoire Hydropower Plant — 220kV Substation
Substation automation for the Gribo-Popoli hydropower plant, supplied to EPC contractor PowerChina.
- Voltage
- 220kV
- Sector
- Hydropower / Substations
Delivered by KE Electric, Masar Alrowad's Strategic Technical and Manufacturing Partner
Bosnia and Herzegovina Wind Power Substation
Pre-fabricated step-up substation equipment for an 84MW wind power project.
- Voltage
- 35kV
- Sector
- Renewable Energy / Substations
Delivered by KE Electric, Masar Alrowad's Strategic Technical and Manufacturing Partner
Lesotho Polihari Water Tunnel — Step-up Substation
Pre-fabricated substation equipment supporting a major water tunnel construction project.
- Voltage
- 11kV–35kV
- Sector
- Water Infrastructure / Substations
Delivered by KE Electric, Masar Alrowad's Strategic Technical and Manufacturing Partner
Frequently Asked Questions
Discuss your substation project with our team
Whether you are planning a new substation or upgrading existing infrastructure, our team is ready to coordinate the technical and local requirements.
Contact Our Team